|
Pune:
Amid stiff global competition, the Pune-based boiler technology
leader Thermax Babcock and Wilcox (TBW) has successfully
bagged an order from JGC Corporation, Yokohama, Japan, for
supplying 1x105 TPH coal fired boiler for the 8.9mw captive
power plant to be installed in the nickel HPP project of
Coral Bay Nickel Corporation in the Philippines.
This
is the third order from JGC for TBW, the previous two
being for supplying boilers to JGCs projects in
Turkmenistan and Thailand.
Says
TBW group general manager K K Diwakar: It is a matter
of great pride for us to have bagged this third order
from JGC. This order reflects reinforcement of JGCs
confidence in TBW in the face of intense global competition.
TBW,
which set up operations in India in 1989, manufactures
and installs a vast range of steam generation systems
for captive and co-generation power plants. TBW products
are also leading brands worldwide in the continuous process
industries such as chemicals, fertilisers, petroleum and
other process plants.
|