Presenting my fourth consecutive Railway Budget, I have
a tremendous sense of pride and gratitude. Pride in the
fact that without imposing undue burden on the common
man, the Railways are poised to create history by generating
a cash surplus before Dividend of Rs 20,000 cr as against
Rs 14,700 cr in the previous year. This is the same Railway
that defaulted on payment of Dividend and whose fund balances
dipped to Rs 359 cr in 2001. I express heartfelt gratitude
towards 14 lakh railway employees who in the face of stiff
competition have conquered all odds with an indomitable
spirit displaying matchless zeal, vigour and teamwork.
Sir, Lord Krishna was acclaimed as Giridhar when in a
moment of crisis he lifted Mount Govardhan on his finger.
However, he did this with the supporting hands of thousands
of fellow villagers. Even though people are giving me
the credit for the turnaround of the Railways, with all
humility I would like to share with the august House that
this miracle has been brought about through the tireless
efforts of 14 lakh railway employees and unbounded affection
and support of my country men. Sir, I would just say:
Navajis
hai sabki, karam hai sabhi ka,
Bade
fakhra se ham bulandi par aaye.
Tarakki
ke sare mayaron se aage,
Naye
dhang laaye, nayee soch laaye.
2
By rendering an unprecedented surplus inspite of the reduction
in passenger fares, we have disproved the myth that Railways
were sinking in to a financial crisis due to social obligations.
Our turnaround strategy based on a perfect blend of commercial
wisdom and empathy for the people has made the Railways
a centre of attraction for the world :
Maana ki badi-badi baaten karna hamen nahin aaya,
Magar
dil par badi kaarigari se naam likhte hain.
Financial
Performance during the Current Year
3
Railways have turned in a record breaking performance
during the first nine months of the current year. Our
Passenger earnings have increased by 14 per cent and Other
coaching earnings by 48 per cent during the first nine
months. A historic increase of 17 per cent was registered
in both freight earnings and gross traffic earnings up
to December. Based on the growth registered so far, the
revised estimates for Passenger, Other coaching, Freight
and Gross Traffic Earnings have been kept at Rs.17,400,
1,726, 42,299 and 63,120 cr respectively. Gross Traffic
Earnings are likely to go up by 16 per cent in comparison
with last year and exceed Budget Estimates by 5.5 per
cent.
4
Ordinary Working Expenses have been contained in spite
of increase in the price of diesel and payment of bonus
at higher rates by effecting economy in expenditure. Under
the accounting reforms process, losses on operation of
strategic lines, receiveable as a subsidy from the Ministry
of Finance, have been reflected as a deduction from Ordinary
Working Expenses. Accordingly, in Revised Estimates these
have been increased by Rs 64 cr and are pegged at Rs.38,091
cr. After providing for Rs.4,108 cr and Rs.7,416cr towards
DRF and Pension Fund respectively in the Revised Estimates,
the Total Working Expenditure is likely to be Rs. 49,615cr.
Interest received on Railways fund balances has been included
in Miscellaneous Receipts. Thus Railways Cash Surplus
before Dividend is expected to be Rs.20,063 crore; Net
Revenue Rs 14,870 cr and Surplus, after payment of Dividend
of Rs.3,579 crore and deferred Dividend of Rs.663 crore,
is expected to be Rs. 10,627 crore. In 2006-07 the Railways
are poised to achieve an operating ratio of 78.7 per cent.
Sir, this is perhaps the first occasion in the glorious
history of 150 years of Indian Railways when our fund
balances would reach Rs. 16,000 crores and the Net Revenue
to Capital ratio, an historic level, of 20 per cent. Indian
Railways name would thus be included in the select
club of Railways in the world, having an operating ratio
of less than 80 per cent. However, we should not be complacent
with this achievement. Imbued with a new zeal and enthusiasm,
Railway employees are eager to write a new saga of development:
Jitna
ab tak dekh chuke ho, ye to bas shuruat hai.
Khel
tamasha aage dekho, dariya dil saudagar ka.
Quantum
jump in Freight Business
5.
Our freight performance has been outstanding for the third
consecutive year and incremental loading this year is
likely to be about 60 MT. Thus the incremental loading
of about 170 MT achieved in the three years of the UPA
Government would exceed the total incremental loading
of the 1990s by 120 per cent. To maintain this rate
of growth, we have on the one hand, taken several steps
to improve the availability of trains and on the other,
have adapted our policies to the needs of the market and
customers.
Cement
and Steel - Mission 200 Million Tonnes
6.
Sir, since introduction of the New Economic Policy in
the year 1991, Railways have been constantly losing share
in cement and steel traffic. As a result Railways
share in transportation of these commodities has declined
from two thirds in 1991 to one third. I am glad to inform
the House that in the first nine months of this year we
have increased our share in transportation of cement and
steel by five to seven percent. While the cement and steel
industry registered a growth rate of ten percent this
year, our cement and steel traffic have increased by twenty
to thirty percent. This is the result of market and customer
oriented policies. Now we are focused on Mission 200 Million
Tonnes. We are hopeful that by the year 2011-12, Railways
traffic from cement and steel industry will increase to
200 MT each.
Container
Traffic - Mission 100 Million Tonnes
7.
Sir, 15 licenses have been issued for the running of container
trains in the last two years. All out efforts will be
made to increase our container traffic to 100 million
tones by 2011-12, from the present 20 million tonnes.
We are confident that over the next five years, investment
worth several thousand crores of rupees will flow in for
the development of container wagons, terminals and other
related rail infrastructure.
A high level working group has been constituted to achieve
these two Missions, which will establish dialogue with
the cement and steel industry and container operators
with a view to develop and implement packages suited to
customer requirements.
Triple
Stack Container Train
8.
Sir, after successful experimentation of running double
stack container trains on diesel route, double stack container
trains are now running between Pipavav and Jaipur. In
2007-08, efforts will be made to run triple stack container
trains with low height container on diesel routes and
double stack container trains on electrified routes on
pilot basis. Such containers would be useful for loading
of motor vehicles.
Long
Term Service Level Agreements
9.
We have recently, signed a 30 year long term Service Level
Agreement (SLA) for transportation of coal. Several new
cement, steel and mega power plants are being set up in
the country. We will provide necessary support services
for laying new lines up to their facilities, enhancing
capacity of existing lines, making available wagons designed
to suit their specific requirements, formulation of pricing
policy and in developing loading and unloading terminals.
We invite all entrepreneurs to enter into long term SLA
s with the Railways.
Merry
Go Round System For Coal
10.
Several companies, including NTPC, are operating their
own MGR Systems. New power plants are also planning setting
up of MGR systems. Railways has domain expertise in running
these systems more efficiently and economically. Therefore,
we invite all existing and new companies to enter into
SLAs with the Railways for the running of MGR s. We would
like to assure them that the Railways will transport their
coal at costs that are lower than their existing costs.
Development
of Freight Terminals
11.
There has been a significant increase in Railways traffic
with the commissioning of the warehouse complex in the
Bangalore Goods shed. We have therefore decided to develop
all basic facilities at freight terminals handling more
than 15 rakes per month, over the next three years. A
new Plan sub head is being opened for expenditure on development
and upgradation of freight terminals to ensure adequate
provision of funds for these works. Various options will
be explored to implement these projects including entrusting
these works to IRCON, KRCL or through Public Private Partnership.
Improvement
of NTKM to GTKM Ratio
12.
Sir, for a payload of one tonne, Railways carry a tare
weight of a little less than a tonne. An improvement of
one percent in this ratio would yield an additional earning
per annum of Rs 1500 cr. A multi pronged strategy of increasing
the payload and reducing the tare weight of trains, running
trains loaded in both directions and minimizing empty
running of trains for maintenance and examination and
other such measures would have to be simultaneously adopted
over the next few years to effect a 5 per cent improvement
in this ratio. All types of vacuum brake rolling stock
will be eliminated in two stages. Wagon examination and
maintenance centres will be reorganized to minimize empty
running of trains. Several trains have wagons that run
empty in both the directions. After implementation of
FOIS, the numbers and location of such wagons will be
monitored to detach them for repair at the nearest depot.
Higher
Axle Load Goods Trains
13.
I am happy to inform the House that the pilot project
of introducing of 22.3 and 22.9 Tonne axle load trains
has yielded good results. Recently, 25 T Axle load trains
have also been run on pilot basis. In 2007-08 we will
extend running of 22.9 tonne axle load trains on several
routes and 25 tonne axle load trains on select other routes.
Wagons
with better payload to tare weight ratio
14.
Sir, Wagons are the bread winning horses of the Railways.
An increase of 10% in wagon productivity would lead to
an annual incremental earnings of Rs.4000 crore for the
Railways. We have earned several thousand crores by improving
the wagon turnaround time and enhancing per wagon payload.
RDSO has designed new covered and open wagons with a pay
load to tare weight ratio of 3 and above, fit for 22.9
T axle load. The carrying capacity of freight trains comprising
of such open and covered wagons will improve by 10 and
30% respectively, compared with existing trains. We have
therefore decided to stop procurement of open and covered
wagons of old design from 2007-08. Production of 25 T
axle load wagons and 22.9 T axle load wagons of new design
will commence in 2007-08. Similarly, 22.9 T and 25 T Axle
load wagons suitable for steel and petroleum products
will also be manufactured.
Manufacture
of new design wagons by Wagon Manufacturers
15.
Railways procure wagons based on RDSO s designs.
We have decided to bring about a total change in this
system. Now, wagon manufacturers will be permitted to
supply wagons of their own designs, with RDSO recommended
bogies, coupler, draft and brake gear. RDSO will certify
and approve the new designs of wagons from the safety
angle within 9 months. Sir, these higher pay load lower
tare weight wagons with new technology would be costlier
compared to old wagons. To encourage the development of
such new technology wagons, a suitable freight discounts
policy will be evolved so that benefits of the new technology
are shared by the Railways and investors. Detailed guidelines
in this regard will be issued early.
Arrangement
of rolling stock maintenance
16.
Sir, we have improved our loading with available resources
through better utilization of existing rolling stock.
Through rationalization of driver and loco links over
the last two years, we have been able to spare more than
250 engines for running other trains. World class facilities
will be provided at all train examination points where
more than 5 goods trains are examined per day. The target
for 2007-08 would be to cover most air brake trains under
the system of premium CC or premium end to end examination.
We have decided to make unit exchange spares based maintenance
arrangements for all types of rolling stock. This would
bring about significant improvement in the productivity
of rolling stock.
Throughput
enhancement works
17.
Sir, speedy expansion of capacity on the 20,000 kms long
high-density network is imperative to maintain the present
rate of growth. An integrated approach of route-wise planning
and implementation will be undertaken to obtain full benefits
from investment on these routes. This network will be
made capable for running 23T axle load trains and mineral
routes would be upgraded for running of 25T axle load
trains. Need based enhancement in line capacity of such
routes will be undertaken by constructing second, third
or fourth lines. Distance between two sections will be
reduced by installing IBS and automatic signaling will
be provided at both ends of busy junction stations to
enhance line capacity. For seamless and faster rail movement,
flyovers and by-passes etc. will be constructed at busy
junction stations and yard designs will be modified to
avoid cross movement of the trains. High speed turnouts
with a speed of 30 km per hour will be laid on such routes.
In 2007-08, 200 each diesel and electric locomotives and
11,000 wagons will be produced. Adequate funds provision
would be made for throughput enhancement works.
Complaint Redressal Mechanism
18.
Sir, most rail customers complain more about the quality
of our service rather than our tariff. We have therefore
decided that on every Zonal Railway one SAG Officer will
be nominated to attend to customer grievances and directions
will be given for disposal of all customer complaints
within three months. At my level too, I have constituted
a Freight Customers Co-ordination Consultative Committee
for all freight customers.
Market
Surveys
19.
Railways earns ninety per cent of its freight business
from transportation of a few select commodities. With
a view to broad base our business and improve stability
in the growth rate we would like to diversify and increase
the mix of carried commodities. Every zonal railway will
engage an independent market survey agency to identify
new traffic streams.
Passenger
Business
20.
Sir, increasing passenger fares does not necessarily imply
a corresponding increase in earnings from trains, though
earnings from individual passengers may go up. In the
current year by inducting 700 additional coaches in popular
trains, we have facilitated travel of more people and
increased the earnings of the Railways. Our policy of
licensing of parcel and catering services through open
tender has also borne good results. In 2006-07, there
has been an increase of 48% in other coaching earnings
and it is likely that earnings from catering license fee
will increase to Rs. 120 cr. It is for these reasons that
despite reduction in fares, the losses in coaching business
are likely to decrease by several hundred crores in the
current year. Sir, we have shown that one can earn even
while serving the common people, by playing the volume
game. Continuing this approach in 2007-08 we will add
another 800 coaches in popular trains.
Provision
of cushioned seats in unreserved passenger coaches
21.
Sir, I am well acquainted with the travails and difficulties
faced by passengers traveling in unreserved second class
coaches. Presently, unreserved second class coaches in
mail/express and ordinary passenger trains are mostly
provided with wooden seats without cushion. This causes
inconvenience to the passengers in sitting. Therefore,
we have decided that from 2007-08, production of wooden
seats will be stopped. In future, cushioned seats will
be manufactured for unreserved second class coaches as
is the case for sleeper coaches. Sir,
Baat
main kaayade ki karta hun, desh ke fayade ki karta hun.
Jis
tarah ped saya deta hai, har musafir ka dhyan rakhta hun.
Provision
of additional ordinary general coaches
22.
The common people have to travel in suffocating crowds
due to paucity of unreserved second class coaches. Therefore,
we have decided that from this year in every newly introduced
train, in place of four, six unreserved second class coaches
will be introduced. Alongside, excluding fully air-conditioned
AC and Jan Shatabdi trains, in existing trains also wherever
possible, efforts will be made to increase the number
of unreserved second class coaches.
Facility
of reservation of lower berth for senior citizens and
ladies
23.
Senior citizens and ladies face considerable inconvenience
when they are allotted upper or middle berths. Therefore,
I have decided that a quota of adequate lower berths will
be provided in AC and Sleeper classes for senior citizens
and women above the age of 45, traveling alone.
Concession
for students
24
Sir, while presenting the budget 2004-05 and 2005-06,
I had announced concessions for unemployed youth appearing
for interviews for jobs in Central and State Government
exams. It is now proposed to give 50% concession to students
appearing in the main written examination conducted by
Union Public Service Commission and Central Staff Selection
Commissions.
Special
coaches for handicapped passengers
25.
We have manufactured SLRD and SRD coaches for the convenience
of handicapped passengers. These specially designed coaches
are equipped with wider doors, wider cushioned seats,
more aisle passage and specially designed toilets for
passengers on wheel-chair. So far we have manufactured
1250 such coaches and it is planned to introduce such
coaches in all Mail and Express trains over the next 2
years.
Introduction
of Vendors Coaches
26.
Milk and vegetable vendors and other retail sellers transport
milk, fruits and vegetables by trains. Due to absence
of earmarked space in the passenger trains, these vendors
carry their milk cans and baskets hanging from the windows.
Vendor coaches will be provided on sections where transportation
of these commodities through passenger trains is common.
Introduction
of train enquiry call centre
27.
From June to September 2007, train enquiry call centres
will start functioning in all four regions of the country.
By dialing the telephone number 139, passengers will be
able to obtain information about arrival and departure
of trains, seat availability etc. at local call rates
from any part of the country. Sir, in these call centres
international level facilities like SMS alert will be
provided In future call centres will provide several services
like Railway Ticketing, Taxi Booking, Hotel Booking etc.
Provision
of Hand held Computer Terminals for TTE
28
Under the existing PRS system, reservation charts are
taken out a few hours before the departure of trains.
Often, due to unforeseen circumstances, several passengers
with reservations do not travel. As a result many berths
remain vacant. Since this information is not fed into
the PRS system, passengers on board the trains or waitlisted
passengers at ensuing stations are not aware of the vacancy
position. Therefore we have proposed to provide hand held
computer terminals to TTEs, in reserved coaches. The TTE
will feed in the current vacancy position, coach wise
and berth wise in to these hand held terminals. These
terminals will be directly linked to the PRS system to
transmit the berth reservation position from running trains
to the PRS system. Based on this information the PRS will
allot vacant berths to waitlisted passengers at ensuing
stations. Hand held terminals will be made available to
the TTEs as a pilot project on four pairs of trains next
year. These would include three Shatabdi Express Trains
running between New Delhi-Amritsar, New Delhi-Dehradun
and New Delhi-Ajmer and Golden Temple Express.
Distribution
of Reserved Tickets
29
More than 5 lakhs reserved tickets are issued every day
from 3000 PRS counters in nearly 1300 reservation centres.
PRS facility will be made available at all Group D stations
and some Group E stations through PRS counters or PRS-cum
UTS counters over the next two years. PRS counters will
also be provided in premises of Post Offices and Defence
organizations to be operated by them. The scheme of booking
reserved rail tickets on the internet has become extremely
popular. To expand the outreach of reserved railway ticketing
in all parts of the country, e-tickets will be issued
through e-seva of State Governments, Post Offices, petrol
pumps and ATMs of Banks.
Unreserved
Ticket Distribution
30.
At present there are nearly 2200 computerised UTS counters
in the country. Over the next two years the number of
such counters will be increased to 8000. Further, 6000
automatic ticket vending machines will be installed in
major cities and connected with the UTS terminals over
the next two years. Ticket would be available at the press
of a button by using smart cards or currency coins. The
coupon ticketing system introduced for suburban passengers
in Mumbai, has gained popularity. We will try to introduce
this system in Chennai and Kolkata also. In order make
the scheme of MST renewal through internet popular, it
has been decided to provide this service free of cost.
In the next year, Central Railway will undertake a pilot
project of issuing tickets through multi-purpose smart
cards. Under this scheme customers will have the facility
to obtain MST as well as daily ticket on the same smart
card. This card could be bought and recharged from different
places in the city. These cards would be readable on touch,
by the hand held terminals of TTEs. The scheme will be
expanded after the success of the pilot projects.
These measures undertaken over the next two years would
alleviate to a large extent the problem of long queues
at ticket counters.
Increase
in capacity of passenger coaches
31
Sir, Innovation is not only an invention or discovery.
Using new methodologies in daily processes is also innovation.
We have designed coaches with new layouts, having significantly
higher capacity than the previous coaches. The capacity
of sleeper coaches has been increased from 72 to 84, AC
Chair Car from 67 to 102, AC 3 Tier from 64 to 81, AC
2 Tier from 46 to 48 and AC 1st from 18 to 22. I have
myself visited the Rail Coach Factory, Kapurthala and
inspected these newly designed coaches. These coaches
will be convenient and comfortable for the passengers.
We have, therefore, decided to start the production of
these new design coaches from 2007-08.
Rakes
with standard composition
32
Due to absence of standard composition for passenger trains,
several trains reach the destination in the morning and
remain standing till night. To ensure better utilization
of the rake links, we have decided to increase the number
of passenger trains having standard rake composition.
Last year, on a pilot basis, through revision in maintenance
practices, BPC of passenger trains was given for 3500
kms in place of 2500 kms. This system would be expanded
further in 2007-08. These two decisions will result in
considerable increase in availability of coaches.
Passenger
Amenities at Stations
33
Sir, last year I had announced that within the next two
years people will observe a perceptible improvement in
the get-up and facilities available at all major stations.
According to this announcement, we had started the work
of developing five railway stations as model stations
in each division. I am happy to inform the House that
this work will be completed at 225 such stations by March
2007. Taking this programme further we will similarly
develop another 300 stations this year.
Cleanliness
Year- 2007
34
Sir, celebrating the year 2006 as the year of customer
service with a smile we have tried to improve passenger
amenities at stations. The year 2007-08 will be observed
as Cleanliness Year. During this year, a special
campaign will be launched to ensure cleanliness and hygiene
at station premises, in passenger trains, railway lines,
waiting rooms etc.
Railways
New Profile - 11th Five year plan
35
The year 2007-08 is the first year of the 11th Five year
plan. Sir:
Ho
izaazat to karun bayan dil apna
Sanjon
rakkha hai maine rail ka ek sapna.
36
The Railways are targeting a freight loading of 1100 million
tonnes and passenger traffic of 840 cr by the terminal
year of the 11th Five year plan. In order to make this
unprecedented growth a reality, it is absolutely essential
that in the next few years the Railways transport
capacity be expanded and doubled, unit cost be brought
down by playing the volume game and customers be provided
world-class services.
The
quantum jump in Investment
37
During the 11th Five Year Plan, we will invest many times
more as compared to earlier plans. There is no readymade
investment policy for a vast network like the Indian Railways.
The growing demand for transportation can only be met
through a harmonious blend of short term and long term
policies. Our short term policy of investing in low cost
high return projects has been successful in eliminating
network bottlenecks and in ensuring effective utilization
of rolling stock. Alongside a twin mid-term and long-term
investment strategy will be adopted to enhance productivity
through, modernization and technological upgradation on
the one hand and enhancement of capacity of the network
and rolling stock on the other.
38
Construction of the Eastern and Western Dedicated Freight
Corridors will start in the year 2007-08. These will be
completed during the 11th Five Year Plan at a cost of
about Rs. 30,000 crores. Even though the Golden Quadrilateral
and its diagonals constitute 16% of the rail network,
more than 50% of the traffic moves on these routes. As
these routes are super-saturated, I have given directions
for conducting of pre-feasibility surveys for construction
of East-West, East-South, North-South and South-South
corridors. My dream is to construct these corridors in
a manner that they develop into efficient and economical
trunk routes for speedier, longer, heavy-haul trains.
After completion of the freight corridors, the problem
of passenger and goods trains running on the same network
at different speeds will be solved and most of the level
crossings would be converted into ROBs. Where possible
ordinary passenger trains running on these routes will
be replaced by MEMU and DEMU trains. This will facilitate
increase in the speed of passenger trains
Gauge
Conversion
39.
Sir, on account of partial gauge conversion on various
routes of the Railway network, the remaining metre and
narrow gauges have become like islands. Cut off from the
main network, these lines give the Railways less than
1 per cent freight traffic whereas they still constitute
20 per cent of the total network. As a result Railways
are losing thousands of crores of rupees annually. Even
freight traffic has become a losing proposition on these
lines. Therefore we will make all efforts to convert the
majority of the metre gauge lines to broad gauge during
the 11th Five Year Plan. Priority will be given to accord
approval for execution of projects which will serve as
alternate routes on the network; significant among these
are Udaipur-Ahmedabad, Lucknow-Sitapur-Pilibhit-Shahjehanpur,
Dhasa-Jetalsar, Jaipur-Sikar-Churu-Jhunjhunu, Ratlam-Khandwa-Akola,
Chhindwara-Nainpur and Ahmedabad-Botad. Projects where
the State Governments contribute 50 per cent of the total
cost would also be given priority in sanction and implementation.
Gauge conversion will facilitate integrating the remote
and far-flung areas of the country with the national main-stream.
Integration with the unigauge network and consequent increase
in traffic and reduction in unit cost of these lines will
reduce losses being incurred on these lines.
Construction
of High Speed Passenger Corridor
40.
Sir, India is today seen as a rising power in the world.
The rapid growth of the economy, rising industrialization
and urbanization and unprecedented growth in intercity
travel, has opened infinite possibilities for developing
high speed passenger corridors. Honble Prime Minister
while laying the foundation of the Western Dedicated Freight
Corridor had expressed the hope that the Indian Railways
would also develop world class passenger systems. Therefore,
we have decided to conduct pre-feasibility studies for
construction of high speed passenger corridors, equipped
with state of the art signaling and train control systems,
for running high speed trains at speeds of 300 to 350
kms per hour; one each in the Northern, Western, Southern
and Eastern regions of the country. These trains will
cover distances of up to 600 kms in two to three hours.
All alternatives including Private Public Partnership
will be considered for implementation of these corridors.
Global warming and changing climatic conditions are a
world wide concern today. These energy efficient and environment
friendly systems would go a long way in alleviating these
concerns.
Suburban
Services
41.
Suburban services are the lifeline of our nations
commercial capital Mumbai. To mitigate the overcrowding
of Mumbais trains, enhancement in capacity of these
services will have to be undertaken during the 11th Five
Year Plan. During this plan period MUTP-Phase I will be
completed. The work on Phase II costing Rs.5,000 crore
is also proposed to be started. Financing of the Rs.5,000
crore MUTP Phase II project will be done with the participation
of Railways, State Governments and multi-lateral funding
institutions. All out efforts will be made to complete
both these phases within the 11th Five Year Plan so that
suburban services and long distance trains are completely
segregated. This will enhance their capacity by 56 per
cent. Ongoing works on suburban services in Kolkata and
Chennai will also be completed on priority basis. During
the 11th Five Year Plan efforts will be made to introduce
air-conditioned class services in suburban trains in Mumbai,
Chennai and Kolkata and escalators at major stations.
Rolling
Stock Modernization and Capacity Augmentation
42
In view of the demands of growing traffic, along with
expansion of network, availability of rolling stock will
be increased through effective utilisation of available
rolling stock, technical upgradation and modernisation
and by setting up new production units. During the 11th
Five Year Plan production of rolling stock will be doubled
as compared with the previous Plan. Capacity of existing
rail coach and loco production units will be enhanced
through expanstion of these units. High horse power, energy
efficient locomotives with new technology will also be
produced. During this plan, production of MEMU, DEMU and
EMU coaches will also be stepped up. One new factory each
for rail coaches, diesel locomotives, electric locomotives
and wheels will also be established. The locomotives to
be manufactured in these units will be equipped with state
of the art technology and will be capable of hauling longer,
heavier high axle load trains. The new Rail Coach Factory
will produce high capacity, modern and comfortable coaches.
Similarly production of 32 tonne axle load, higher pay
load lower tare weight and track friendly wagons will
start for the new Dedicated Freight Corridors.
Use
of IT in the Railway services
43
In the XI five year plan, investment in IT projects will
be increased to several thousand crore rupees to harness
the immense possibilities offered by IT in the interest
of Indian Railways. IT applications will be deployed to
increase passenger and freight earnings, improve the image
of the Railways in the eyes of the customer, reduce operating
costs, ensure effective utilization of human and physical
resources and to help the top management in arriving at
long-term policy decisions by developing MIS & LRDSS.
A commercial portal will be developed in the next 3 years
for yield management, specially to attract traffic for
returning empties and filling up vacant seats. All modules
of FOIS including rolling stock maintenance and examination,
revenue apportionment, crew management, control charting
COIS etc. will be integrated and implemented in a time
bound manner for completion by 2010. Alongside ERP packages
will be implemented in workshops, production units and
selected zonal railways. A common website integrating
the more than 50 different web-sites of Railways will
be developed with built in facilities like e-payment and
e-tendering. For an integrated approach in IT, CRIS will
be entrusted with coordination of all IT applications
of the Railways and for development of a comprehensive
vision on IT. CRIS will be developed as an autonomous
and empowered organization, drawing officers from various
Railways services. Indian IT companies have hoisted the
national flag all over the world. We invite these companies
to take part in various IT projects of the Railways under
public private partnership.
Railway
Electrification
44.
The electrified network will be extended over the Golden
Quadrilateral and its diagonals, and in all directions
from Kashmir to Kanniya Kumari and Guwahati to Amritsar
by the end of the 11th Five Year Plan. Electrification
of Thiruvananthapuram-Kanniya Kumari, Thrichur-Guruvayur,
Tiruchirapalli-Madurai, Barabanki-Gorakhpur-Barauni-Katihar-Guwahati
and Jallandhar to Baramullah sections will be completed
during the 11th Five Year Plan. In the first phase, electrification
of Jalandhar -Jammu, Barabanki-Gorakhpur-Barauni and Tiruchirapalli-Madurai
sections are proposed to be taken up in 2007-08. Similarly,
doubling and electrification of Pune-Wadi-Guntkal and
electrification of Daitari-Banspani, Haridaspur-Paradeep
new lines will be undertaken by Indian Railways
Public Enterprise RVNL in the coming years.
Public
Private Partnership Schemes
45.
Investments at a much larger scale will be required for
the above mentioned capacity and expansion network as
compared with the provision made in the Tenth Five Year
Plan. The funding of this plan of several lakh crores
would require multi-source approach based upon deployment
of internal resources, market borrowing, public private
partnership and budgetary support. The improved financial
performance of the Railways will enable a large share
of the financing to be met from internal and external
budgetary resources. I am not in favour of blind privatisation
of the Railways nor is PPP a compulsion or fashion for
us. We are seeking partnership with the private sector
on the terms that are in the interest of Railways and
our customers. For example, by leasing out catering and
parcel services we have reduced our catering and parcel
losses of more than a thousand crores. We have enhanced
our capacity by attracting private investments in the
wagon investment schemes and siding liberalization schemes
etc. Even while retaining the core activity of train operations,
we have awarded licenses to private parties for running
container trains, which is likely to attract investment
of thousands of crores in wagons and construction of terminals
over the next few years. We want to have many more such
PPP Schemes where one and one make eleven and not two.
Public Private Partnership options will be explored with
the aim of modernization of metro and mini-metro stations
with world class passenger amenities, development of agro
retail outlets and supply chains, construction of multi-modal
logistic parks, warehouses and budget hotels and expansion
of network and increase in production capacity. We have
constituted a PPP Cell which will develop the policy framework
to provide non-discriminatory level playing field to investors,
prepare the bankable documents and set up the procedure
for awarding partnerships through open tendering system.
Railway
Safety
46.
Railway safety is our prime concern. I am glad to inform
the House that funds for replacement of overaged Railway
assets are now provided as soon as the assets become due
for replacement. Sir, we have allocated Rs.5,500 crore
towards Depreciation Reserve Fund for the year 2007-08
as compared to Rs.2,100 crore provided in 2001-02. This
has had a direct impact on Railways safety record.
Although the gross traffic volume has increased from 724
Million train kilometres in 2001-02 to 825 Million train
kilometres in 2005-06, the number of accidents is expected
to be less than 200 in 2006-07 against 473 in the year
2001.
47.
Of the Rs.17,000 crore Special Railway Safety Fund, most
of the works of renewal of overaged tracks, bridges, track
circuiting and rolling stock will be completed by March
2007 and all remaining works will be completed by March
2008. Sir, as per our Corporate Safety Plan, the testing
of Anti-Collision Device on North East Frontier Railway
is in its last phase and is likely to be completed by
March 2007. Besides this, the General Managers of the
Zonal Railways have been delegated the powers to approve
construction of subways costing upto Rs, 50 lacs, to reduce
accidents at unmanned level crossings. The production
of better crash worthy coaches has commenced. In future,
the number of such coaches will be further increased to
ensure safety of passengers.
Railway
Security
48.
In view of the serious bomb blasts which occurred last
week on 18th February in train number 4001 Delhi-Attari
Link Express near Panipat and in July 2006 in Mumbai Suburban
Services, we have taken several steps to strengthen and
modernize the security arrangements. In order to provide
necessary equipments and other resources for Railways
security works, adequate funds are being made available
from Passenger Amenity and Machinery & Plant Plan
heads. The allocations for these works will be enhanced
substantially and I would like to assure the House that
funds will not be a constraint for these works. Besides
increasing the number of trained dogs in the existing
dog squads, in many sensitive divisions of the country
explosive detection devices, door frames and hand held
metal detectors are being installed to provide better
security for trains and passengers. In addition, equipments
like CCTV and smart video cameras have been installed
at sensitive stations. In consultation with security experts,
an integrated extensive security and surveillance system
will be developed for Mumbai Suburban Services which will
be equipped with high quality security equipments. Railway
Protection Force is escorting 1,450 trains everyday. 8,000
vacant posts in Railway Protection Special Force will
be filled up shortly on an all India basis. Intensive
training is being imparted to Railway Protection Force
, in order to increase their professional expertise and
efficiency Recently, Jagjivan Ram Railway Protection Force
Academy, Lucknow has been given the status of a Centralized
Training Institute.
Achievement
of Railways in Sports
49.
As always, Railways have, registered important achievements
in sports at National and International level this year
too. In the Commonwealth Games held in Melbourne, Indian
Railways athletes contributed by winning two gold
and six silver medals. In the recently concluded Asian
Games held at Doha, athletes from Indian Railways made
a major contribution by winning two gold, two silver and
nine bronze medals. In 2006-07, teams from Indian Railways
have participated in 33 team championships and won 19
out of them. Former National Badminton Champion Ms. Madhumita
Bisht has been awarded with Padma Shree for her outstanding
contribution and three Sports persons Ms. Dola Banerjee
for Archery, Shri Akhil Kumar for Boxing and Shri Sushil
Kumar for Wrestling have been decorated with Arjuna Awards.
International
Cooperation
50
Indian Railways have signed a memorandum of understanding
with Italy, Germany, Russia and South Africa to promote
bi lateral cooperation. The Railways are playing an important
role in promoting the Look East policy of
the Government. The programme for training of Railway
personnel BIMSTEC and Mekong Ganga countries launched
by Indian Railways has been widely acclaimed. Taking this
initiative further, the Railways has extended this facility
of free training to the railway personnel of African countries
in the current financial year. Chairman Railway Board
has been elected first chairman of Asian Railway Association.
Indian Railways is playing an important role in the functioning
of the UIC (International Railways Union). The Chairman
Railway Board has already been elected as the first non
European President of UIC.
Staff
Welfare
51
Sir, 14 lakhs employees have brought about the financial
transformation of the Railways by showing incomparable
passion and commitment.
Jisne Pahunchaya Bulandi Par Usey Sammaan Den,
Karee Mehnat Ko Unki Milkar Maan Den.
52
Railways contribution to the Staff Benefit Fund
is proposed to be increased from Rs.30 per person to Rs.35
per person. Out of this additional contribution Rs.3 will
be utilised to give immediate relief in times of crisis
arising out of natural calamities and Rs. 2 will be utilised
to provide training for developing occupational skills
of physically challenged children especially girls, of
Railway employees.
53
In order to bring about fundamental improvement in the
condition of staff colonies, various alternatives for
their development and maintenance through IRWO or through
Public Private Partnership will be explored. Decision
on this subject will be taken after arriving at a general
consensus and taking the staff federations into confidence.
In order to provide accommodation to the relatives of
indoor patients admitted in large hospitals in metropolitan
cities, rest houses with 50 rooms each will be constructed
near the hospitals in 4 large cities, namely Delhi, Mumbai,
Kolkata and Chennai. The railway employees will be provided
accommodation in these rest houses at nominal charges.
54
An extensive programme of training to develop market and
customer friendly attitude amongst frontline staff, who
are in constant contact with the customers, will be organized
at selected stations. Upon the success of this programme,
it would be extended throughout the country.
55
With a view to improve the promotional prospects of Group
D employees, a committee has been constituted
to make an in-depth study of all matters relating to the
subject and to submit its report within 6 months. We have
decided that ex-servicemen and Central Government employees
recruited in the Railways will be eligible for post retirement
complimentary passes by giving a weightage equivalent
to half of their prior service while calculating their
eligibility based on length of service in the Railways.
Organizational
and Human Resource Development
56
Railways will have to develop a strong management team
in which players play, not for themselves, but for the
success of the team to tackle complex situations of the
competitive market and to fulfill the growing expectations
of its customers. A decision in the matter would be taken
by December 2007, after evolving a concensus through dialogue
with representatives of all Railway services and based
upon recommendations of different expert groups constituted
so far. The institutions of GMs, DRMs and CAO (Construction)
would be strengthened and developed as profit centre,
business unit and project unit respectively by suitable
empowerment.
57
Sir, Railway employees and officers require training at
periodical intervals in view of rapid changes in the underlying
economic and competitive environment. We have, therefore
decided that Railway officials will be sent on training
to reputed national institutions once every five years
and for foreign training every ten years. Officers would
have to undergo a mandatory training before promotion
to JA, SA and HA grade.
58
The Railway Staff College Building in Vadodara will be
renovated in consultation with renowned architects in
such a way that its old elegance and splendour is retained
even while it is equipped with all modern amenities. Rail
Bhawan would be made centrally air-conditioned and a building
equipped with modern facilities.
Establishment
of Railway Chair at IIM, Ahmedabad
59
It has been decided to set up a Chair at IIM Ahmedabad
to encourage research in Railway infrastructure and manangement.
Recruitment
Drive for Scheduled Castes and Scheduled Tribes
60
Ninety five per cent of the vacancies for Scheduled Castes
and Scheduled Tribes have been filled up by launching
special drives. Similarly seventy five per cent of the
backlog in filling up vacancies in the promotional quotas
has been successfully cleared.
Recruitment
of candidates from backward class
61
Action is being taken for the recruitment of candidates
from backward classes on all the Zonal Railway against
the reservation quota of 27 per cent.
Public
Sector Undertakings
62
During the year 2005-06, 9 public sector undertakings
of the Ministry of Railways have put up a good performance
and achieved a combined turn over of Rs.7,034 crore and
earned net profit of Rs.818 crore. They have made a combined
dividend payment of Rs.274 crore to the Railways. Container
Corporation of India Limited registered a turnover of
Rs.2,489 crore and have earned a net profit of Rs.526
crore. IRFC has registered a turnover of Rs.2,020 crore
and a net profit of Rs.334 crore. IRCON International
Limited achieved its highest turnover so far, of Rs.1,113
crore and earned a net profit of Rs.81 crore in 2005-06.
On the basis of its excellent performance, this company
has been given a Schedule A status. RITES
has registered a turnover of Rs.426 crore and a net profit
of Rs.99 crore.
RVNL
63.
RVNL is executing 46 projects at a cost of about Rs.12,000
crore to expand the capacity on high density network of
which 14 would be completed by the end of 2006-07. Construction
of 544 kilometre Broad Gauge line is likely to be completed
in the year 2007-08. Out of the remaining 24 projects,
16 projects will be completed in 2008-09 and the rest
in 2009-10. In addition, new projects would be handed
over to RVNL for implementation. As per the extant practice,
public private partnership projects for expansion of network
are being executed by SPVs constituted on the basis of
MOU. It has been decided that in future all options for
award of Public Private Partnership projects including
awarding the project through open competitive bidding
would be explored. While awarding the projects which are
linked to a particular port or factory to an SPV, the
concession period of each project would be fixed with
a view to ensure reasonable rate of return on investment,
rather than having a pre-determined concession period
for all the projects.
Passenger
Services
64
We operate more than 9,000 passenger trains everyday.
In view of the increasing demand of the passengers, I
propose to introduce the following services from the year
2007-08.
65
New Trains :-1. Shri Chhatrapati Sahu Maharaj Terminus,
Kolhapur-Ahmedabad Express (Weekly)
2.
Howrah-Rampurhat Express (Daily)
3.
Jhansi-Kanpur Express (Daily)
4.
Pune-Gorakhpur Express (Weekly)
5.
Delhi-Shamli DEMU (Daily)
6.
Bapudham Motihari-Varanasi (3 Days a week)
7.
Bikaner-Jaisalmer Express (Two pairs) (Via Kolayat)
(Daily)
8.
Mumbai-Aurangabad Janshatabdi Express (6 Days in a Week)
9.
Bhagalpur-New Delhi Express (Weekly)
10.
Bijapur-Bagalkot Express (6 Days in a Week)
11.
Allahabad-Mathura Express (Daily)
12.
Nasik-Pune Express (Daily)
13.
Coimbatore-Nagercoil Express via Madurai (Daily)
14.
Bhubaneswar-Rameswaram Express (Weekly) (After Gauge
Conversion)
15.
Gorakhpur-Yesvantpur Express (Weekly)
16.
Yesvantpur-Chennai Express (Weekly)
17.
Farrukhabad-Kasganj Express (Two pairs) (Daily) (After
Gauge Conversion)
18.
Indore-Amritsar Express (Weekly)
19.
Chennai Egmore-Nagore Express (Daily) (After Gauge Conversion)
20.
Rewa-Jabalpur Intercity Express (Daily)
21.
New Delhi-Sahibabad EMU Service (Daily)
22.
Banka-Bhagalpur Passenger (6 Days in a week)
23.
Chennai Egmore-Rameswaram Express (6 Days in a week)
(After Gauge Conversion)
24.
Chhapra- Chhatrapati Shivaji Terminus(Mumbai) Jansadharan
Express via Siwan, Gorakhpur (Weekly)
25.
Mumbai-Ajmer/Udaipur Express (3 Days in a week) (After
Gauge Conversion)
26.
Solapur-Bagalkot Express (6 days in a week)
27.
Ajmer-Ratlam Express (Daily 2 pairs) (After Gauge Conversion)
28.
Vadodara-Bhilad Express (Daily)
29.
Patna-Dehri-on-Sone Intercity Express (Daily)
30.
Gandhidham-Palanpur Express (Daily)
31.
Lucknow Jn-Saharanpur Express (Daily) (In lieu of Lucknow-Saharanpur
Link Express)
32.
Jabalpur-Delhi via Itarsi ( 2 Days in a week)
Garib
Rath
66
While introducing the Garib Rath last year, I had announced
that in the coming years, all the State capitals will
be linked with Garib Rath trains. Pursuant to this announcement,
I propose to introduce following new Garib Rath trains
:-
1.
Secunderabad-Yesvantpur Garib Rath Express (3 days in
a week)
2.
Jaipur-Bandra (Terminus) via Ahmedabad Garib Rath (3
days in a week)
3.
Kolkata-Patna Garib Rath Express (3 days in a week)
4.
Bhubaneswar-Ranchi Garib Rath Express (3 days in a week)
5.
Thiruvananthapuram-Lokmanya Tilak (Terminus) Garib Rath
Express (2 days in a week)
6.
Kolkata-Guwahati Garib Rath Express (2 days in a week)
7.
New Delhi-Dehradun Garib Rath Express (3 days in a week)
8.
Raipur-Lucknow Jn. Garib Rath Express (2 days in a week)
Extension
of trains
67
I am glad to announce the extension of run of the following
services :-
1.
4517/4518 Allahabad-Ambala Cantt. Unchahar Express upto
Chandigarh
2.
207/208 Tirupati-Guntakal Passenger upto Hubli
3.
2315/2316 Sealdah-Ajmer Ananya Express upto Udaipur
4.
2105/2106 Mumbai-Nagpur Vidarbha Express upto Gondia
5.
1103/1104 Agra Cantt.-Nizamuddin Intercity Express upto
New Delhi
6.
9165/9166 Ahmedabad-Faizabad Sabarmati Express upto
Varanasi
7.
4649/4650 Amritsar-Darbhanga Saryu Yamuna Express upto
Jai Nagar (After Gauge Conversion)
8.
2705/2706 Secunderabad-Vijayawada Express upto Guntur
9.
Shikohabad-Farrukhabad Passenger upto Kasganj (After
Gauge Conversion)
10.
3185/3186 Sealdah-Darbhanga Gangasagar Express upto
Jai Nagar (After Gauge Conversion)
11.
364 Kottayam-Thiruvananthapuram Passenger upto Nagarcoil
12.
571/572 Manduadih-Mau Passenger upto Azamgarh
13.
209/210 Howrah-Darbhanga Passenger upto Jai Nagar (After
Gauge Conversion)
14.
5037/5038 Kanpur-Farrukhabad Express upto Kasganj (After
Gauge Conversion)
15.
6509/6510 Ajmer-Bangalore Express upto Mysore
16.
4673/4674 Amritsar-Darbhanga Shaheed Express upto Jai
Nagar (After Gauge Conversion)
17.
531A/532A Parli-Latur Passenger upto Osmanabad (After
Gauge Conversion)
18.
2413/2414 Jammu Tawi-Jaipur Express upto Ajmer
19.
5107/5108 Lucknow-Kanpur Utsarg Express upto Kanpur
Anwarganj
20.
469/470 Lucknow-Farrukhabad Passenger upto Kasganj (After
Gauge Conversion)
21.
5309/5310 Aishbagh-Bareilly Rohilkhand Express upto
Kasganj
22.
2465/2466 Jodhpur-Sawai Madhopur Express upto Indore
23.
Gaya-Kiul Passenger upto Jhajha (1 pair)
Increase
in frequency
68
Honble Members will be happy to know that it is
proposed to increase the frequency of the following trains
:-
1.
9311/9312 Indore-Pune Express (from 2 days in a week
to 3 days in a week)
2.
1561/1562 Miraj-Belgaum Passenger (from 6 days in a
week to daily)
3.
2149/2150 Pune-Patna Express (from 2 days in a week
to 4 days in a week)
4.
2843/2844 Puri-Ahmedabad Express (from 3 days in a week
to 4 days in a week)
5.
2345/2346 Howrah-Guwahati Saraighat Express (from 5
days in a week to daily)
6.
1563/1564 Miraj-Belgaum Passenger (from 6 days in a
week to daily)
7.
2309/2310 New Delhi-Patna Rajdhani Express (from 2 days
in a week to daily)
8.
6603/6604 Thiruvananthapuram-Mangalore Express (from
3 days in a week to daily)
9.
2835/2836 Hatia-Yesvantpur Express (from weekly to 2
days)
10.
209/210 Machilipatnam-Tirupati Passenger (from 3 days
to daily)
11.
6595/6596 Patna-Bangalore Express (from 2 days in a
week to 6 days in a week)
12.
2419/2420 New Delhi-Lucknow Gomti Express (from 6 days
in a week to daily)
13.
6527/6528 Yesvantpur-Kannur Express (from weekly to
3 days in a week)
14.
6315/6316 Bangalore-Kochuvelli Express (from weekly
to 3 days in a week)
Annual
Plan 2007-08
69
Sir, the outlay of Annual Plan for the year 2007-08 is
proposed at Rs.31,000 crore. This is the largest Annual
Plan for the Railways so far and exceeds the plan outlay
for the current year by 32 per cent. The outlays of the
Annual Plans over the last three years have increased
by about two and a half times. It is a matter of pride
that three fourths of the plan outlay will be sourced
from internal and extra budgetary resources and the share
of internal resources alone would be 56 per cent. Deployment
of internal resources is projected at Rs.17,323 crore;
61 per cent more than last year. Extra budgetary resources
will include Rs.5,000 crore for leasing of rolling stock
through IRFC, loan of Rs.240 crore to be raised by RVNL
and investment of Rs.500 crore under the Wagon Investment
Scheme. The total budgetary support to be received from
General Exchequer of Rs.7,611 crore includes Rs.1,165
crore for SRSF, Rs.725 crore from Central Road Fund and
Rs.5, 721 crore for the remaining projects.
70
The thrust of the Annual Plan is maintaining the high
growth rate through early completion of throughput enhancement
works, traffic facilities and works related to network
expansion and development of high traffic density routes.
The outlay for traffic facilities plan head has been increased
by 30 per cent to Rs.800 crore. In order to remove impediments
to better operation and better turnaround of wagons, upgradation
and development of goods sheds, construction of flyovers/bye
pass, IBS and other traffic facility works have been given
highest priority. The proposed outlay for doubling has
been increased almost two fold at Rs.2,000 crore to expedite
execution of doubling projects. Besides this Rs.1,358
crore will be spent on projects to be executed by RVNL.
The allotment of Dedicated Freight Corridor has been proposed
at Rs.1,330 crore.
71
Outlay for the four other major planheads have been kept
at Rs.5,036 crore. Provision of Rs.1,610 crore has been
made for New Lines, Rs.2,404 crore for Gauge Conversion,
Rs.300 crore for Electrification and Rs.722 crore for
Metropolitan Transport Projects. The outlay for safety
related plan heads includes Rs.3,360 crore for Track Renewal,
Rs.597 crore for Bridge Works, Rs.1,597 crore for Signal
And Telecom works, Rs.551 crore for construction of Road
Over/Under Bridges and Rs.500 crore for manning of unmanned
level crossings. Additional fund of Rs.2,725 crore have
been sought from Ministry of Finance for the national
projects of Jammu and Kashmir and North Eastern Region,
namely Udhampur-Srinagar-Baramulla, Jiribam-Imphal Road
(Tupul) and Kumarghat-Agartala new line and Lumding-Silchar-Jiribam
gauge conversion projects.
Ongoing
Projects
72
In the current year, construction of about 2000 kilometres
of broad gauge lines is likely to be completed. This has
been possible because of Railways financial turn
around and decentralization of powers to field units.
Railways are executing the ongoing National projects in
Jammu and Kashmir and the North Eastern Region in all
earnestness. The construction of new line between Kakapore
and Budgam in the Kashmir Valley is almost complete and
will be opened for passenger traffic operations shortly.
I express my gratitude to the Honble Prime Minister
for declaring the construction of Bogibeel Bridge on river
Brahamputra, Rangiya-Murkongselek gauge conversion and
Azra-Byrnihat and Dimapur-Kohima New Line projects as
National Projects.
New
Lines
73
It gives me a great pleasure to inform that construction
of new lines from Kolayat to Phalodi, Daitari-Banspani
and Gandhinagar-Kalol has already been completed. Karimnagar-Jagityal
section of Pedapalli-Karimnagar-Nizamabad is nearing completion.
74
The target for construction of new lines in 2007-08 has
been fixed at 500 kilometres. The sections include:
1.
Puntamba-Shirdi
2.
Mahoba-Khajuraho
3.
Qazigund-Kakapore and Budgam-Baramulla
4.
Jaggyapet-Malachervu
5.
Kottur-Harpanhalli
On completion of these sections, work on Puntamba-Shirdi
and Jaggyapet-Malachervu new line projects will be completed.
Gauge
Conversion
75
Gauge conversions of Neemuch-Ratlam, Samakhyali-Gandhidham
of Gandhidham-Palanpur, Latur-Osmanabad of Miraj-Latur,
Trichy-Puddukottai of Trichy-Manamadurai, Khagaria-Hasanpur
of Khagaria-Samastipur, Kinwat-Mudkhed of Adilabad-Mudkhed
and Basvanna Bagewadi-Bagalkot of Solapur-Gadag have already
been completed. Besides this, works on Ajmer-Chittaurgarh,
Puddukottai-Karaikkudi of Trichy-Manamadurai, Vriddhachalam-Salem
of Cuddalore-Salem, Manamadurai-Rameshwaram, Sonamukhi-Rainagar
of Bankura-Damodar railway line and Hasanpur-Samastipur
gauge conversion projects are likely to be completed shortly.
76
After completion of gauge conversion works on these sections,
the projects of Neemuch-Ratlam, Gandhidham-Palanpur, Ajmer-Chittaurgarh-Udaipur,
Khagaria-Samastipur, Adilabad-Mudkhed, Cuddalore-Salem
and Madurai-Rameshwaram will be completed. During 2007-08,
a target of completion of about 1,800 km of following
gauge conversion works has been fixed:
1.
Kurduwadi-Osmanabad of Miraj-Latur
2.
Saharsa-Dauram Madhepura of Mansi-Sahrsa-Purnea
3.
Phulera-Ringus-Rewari of Ajmer-Ringus-Rewari
4.
Pipar Road-Bilara
5.
Darbhanga-Sitamarhi of Jayanagar-Darbhanga-Narkatiaganj
6.
Akola-Purna
7.
Pratapnagar-Bodeli of Pratapnagar-Chhota Udepur
8.
Pakala-Madanapalli of Dharmavaram-Pakala
9.
Kaptanganj-Thawe of Kaptanganj-Thawe-Chhapra
10.
Bagalkot-Gadag of Solapur-Gadag
11.
Mathura-Kasganj of Kanpur-Kasganj-Mathura
12.
Katihar-Jogbani
13.
Guntakal-Kalluru of Guntur-Guntakal-Kalluru
14.
Vellore-Thiruvannamalai of Villupuram-Katapadi
15.
Karaikkudi-Manamadurai of Trichi-Manamadurai
16.
Mehsana-Patan
17.
Shimoga-Anandapuram of Shimoga Talguppa
With
the completion of these sections, Trichy-Manamadurai,
Katihar-Jogbani, Akola-Purna, Solapur-Gadag, Pipar Road-Bilara,
Guntur-Guntakal-Kalluru, projects would be completed.
Gauge conversion of Sakri-Nirmali and Jhanjharpur-Laukaha
Bazar have been targeted for completion in 2008-09.
Doubling
77
During 2006-07, doubling of 450 km is expected to be completed,
while about 700 km has been targeted for the year 2007-08.
New
projects
78
I feel great pleasure in informing the House that gauge
conversion of Bardhaman-Katwa, Sadulpur-Bikaner and Ratangarh-Degana,
Mailaduturai-Karaikkudi and Thiruturaipundi-Agastiyampalli
have been included in the Budget. Dahod-Indore via Jhabua
and Deoband (Muzaffarnagar)-Roorkee new line construction
works have been included in the Budget. Doubling works
of Pen-Roha, Mau-Indara, Kukrana-Panipat, Bimlagarh-Dumitra
(Part), Barabanki-Burhwal, New Guwahati-Digaru, Alwar-Harsauli,
Samalkot-Kakinada, Kalumna-Nagpur, Barbil-Badajamda, Adra-Joychandipahar,
Kuruppantara-Chingavanam, Ramanagram-Mysore, Ambalapuzha-Haripad,
Arasikere-Birur, Titlagarh-Raipur, Gokulpur-Midnapore
and Mahananda Bridge between Malda and Old Malda have
been given approval. Gauge conversion work of Bhojipura-Pilibhit-Tanakpur
and new lines between Chhota Udepur-Dhar, Bihta-Aurangabad,
Rayadurg-Tumkur, Bariarpur-Mananpur, Chandigarh-Baddi
and Sultanganj-Katuria have been given in principle approval.
Doubling of Pune-Guntakal which includes Bhigwan-Mahol
is being processed for seeking approvals. Action on Wardha-Nanded
via Yavatmal-Pusad new line will be taken after the receipt
of approval from Government of Maharashtra on the cost
sharing of the project. Further action regarding new line
between Masrakh-Rewa Ghat via Taraiya-Amnour, Damoh-Kundalpur
and Araria-Supaul and doubling of Muzaffarpur-Bettiah-Narkatiaganj-Valmikinagar
will be taken after receiving the survey reports. For
some of these projects the Governments of Uttarakhand,
Karnataka and West Bengal have given their consent for
sharing a part of the total cost. The Government of Andhra
Pradesh has requested for construction of new lines between
Cuddappah-Bangalore on 50:50 cost sharing basis. All such
proposals will be considered on highest priority while
seeking necessary approvals. I would once again like to
request all the State Governments to co-operate by sharing
the cost of new and ongoing projects on 50:50 basis.
Surveys
79
On the demand of the Honble Members the following
survey works are proposed to be taken up:
New
lines :
1.
Karad-Chiplun
2.
Aligarh-Kasganj
3.
Rupai-Parshuramkund
4.
Gudur-Durgarajapatnam
5.
Shri Satya Sai Prashanthi Nilayam-Kadiri via Nallamada
6.
Morappur-Dharmapuri
7.
Madurai-Karaikkudi
8.
Gaya-Natesar
9.
Needmangalam-Puddukottai
10.
Nanjangud-Nilambur
11.
Tellichery-Mysore
12.
Dindigul-Kumuli via Bodinayakkanur
13.
Tumkur-Davangere
14.
Dharwad-Bayalahongal-Belgaum
15.
Ratlam-Banswara
16.
Markapur-Shrisailem
17.
Chakia-Bairgania via Madhubani, Phenhara, Piprahi
18.
Kinwat-Mahur
Gauge
conversion
1.
Chhindwara-Nainpur
2.
Himmatnagar-Khedbrahma including extension upto Abu
Road
3.
Indara-Dohrighat
Doubling
1.
Rajkharaswan-Adityapur third line
2.
Sambalpur-Talcher
3.
Mudkhed-Parbhani
4.
Secunderabad-Bhongir third line
5.
Jirat-Katwa
6.
Adra-Gardhubeshwar
7.
Khurda Road-Puri
Rail
Flyovers
1.
Dongaposi
2.
Dum Dum
3.
Itarsi
4.
Katni.
Establishment
of New Electric Loco Works at Madhepura
80
In order to meet the demands of growing rail traffic and
in spite of an annual increase in the production capacity
of Chittaranjan-Locomotive Works from 150 to 200 engines
per year, setting up of a new electrical locomotive workshop
has become inescapable. Therefore a new Electric Locomotive
Factory at a cost of about Rs.1,300 crore will be set
up at Madhepura. This will help in all round development
of the backward areas of North Eastern region and North
Bihar.
Modern
Signalling Arrangement
81
Track circuiting at more than 96 per cent places on A,B,C
routes, multi-aspect colour light signaling system on
A and C routes and other upgradation works from Special
Railway Safety Fund have been completed at 1,036 stations.
All other works taken up under this fund are targeted
to be completed by March 2008. To bring about qualitative
improvement in reliability of signaling systems, an integrated
plan will be prepared and executed during 2007-08. Sir,
till now signalling has been mainly used for Railway safety,
whereas modern signaling systems have possibilities to
effect improvement in line capacity. Therefore we have
decided that the average distance between two block sections
on high density networks will be reduced from 12 kilometres
to 8 kilometres by using the IBS system. Certain junction
stations having heavy traffic will be provided with Automatic
Block Signaling System on their approaches.
Joint
Venture with Kerala Government
82
Sir, in view of the rapidly growing passenger services
there is going to be a requirement of additional passenger
coaches in future. At present, Railways have a limited
capacity to manufacture ICF design fabricated bogies for
passenger coaches. Railways will try to make good this
shortfall by setting up a joint venture company with Steel
Industries Kerala Limited, Aleppey, a public sector undertaking
of the Government of Kerala.
Setting
up of Wagon, Bogie Complex at Dalmianagar
83
The new Dedicated Freight Corridor is being constructed
to operate 32.5 tonne axle load goods trains and double
stack container trains. At present only 22.9 tonne axle
load wagons are being manufactured in the country. To
manufacture higher axle load wagons, production of new
technology bogies, couplers, draft gears, would be necessary,
for which an industrial complex will be developed at Dalmianagar.
To achieve this objective all alternatives, including
execution through public private partnership, would be
considered.
Suburban
Services
84
In keeping with the announcement made in the last Budget
for Mumbai suburban services, three additional rakes have
been provided on Western Railway and the fourth rake will
be made available by March 2007. On Central Railway also
one additional rake has been added in Thane-Turbhe area
and another will be available by March 2007. I am happy
to inform the House that work of DC to AC conversion has
been completed on Kasara to Titawala section. The quadrupling
work from Borivili to Virar is likely to be completed
soon and induction of new rakes through MRVC will also
start early. With the help rakes, 150 new Suburban trains
are proposed to be introduced, by making by making suitable
adjustments in the time table on Western and Central Railways.
I hope these efforts will bring substantial improvement
in Railway services.
85
Four additional EMU rakes have been provided in the current
year for Kolkata resulting in increase in the suburban
services from 1,039 to 1,050. Five more rakes will be
added in the next few months. In Chennai five new EMU
rakes have been provided in the current year, as a result
of which there has been an increase in suburban services
by 30. Besides composition of 27 rakes have been increased
from 8 to 9 coaches and four other rakes from 3 to 6 coaches.
In the next few months 6 more rakes will be added, which
will fulfill the increased requirement of MRTS and other
services.
PART
II
Budget
Estimates 2007-08
86
Sir, I shall now deal with the Budget Estimates for 2007-08.
87
The target for freight loading for the year 2007-08 has
been kept at 785 MT and for freight output at 516 billion
tonne kms. Maintaining the double digit growth rate, the
Budget Estimates for Freight, Passenger and other Coaching
Earnings have been kept at Rs.46,943 crore, Rs 20,075
crore and Rs 2,200 crore respectively. Gross Traffic Earnings
have been projected as Rs 71,218 crore, reflecting an
increase of Rs.7,248 crore on the Revised Estimates for
the current year.
88
Sir, provision for Ordinary Working Expenses for 2007-08
has been kept at Rs.42,687 crore, which is 12 per cent
more than the Revised Estimates for 2006-07. Provision
for Depreciation Reserve Fund has been pegged at Rs.5,496
crore and Pension Fund at Rs.8,683 crore. Thus total Working
Expenses will be Rs.56,687 crore and Net Traffic Receipts
Rs.14,631 crore. While Railways cash surplus before
dividend is projected at Rs.21,578 crore, the targeted
Operating Ratio is 79.6 per cent. Fund balances to end
of the next financial year are estimated at Rs.16,170
crore. The memorandum on rate of dividend payable to General
Revenues for 2007-08 has been submitted for consideration
of the Railway Convention Committee. Dividend payable
for 2007-08, assessed on the basis of the rate of dividend
for 2006-07, is estimated at Rs.3,909 crore. In 2007-08,
the Railways will not only meet this liability but will
also discharge entire remaining deferred dividend liability
of Rs.664 crore. In the Plan outlay for the next year,
Rs.17,323 crore will be provided from internal resources.
Dynamic
Pricing and Commercial Policy
89
The dynamic pricing policy for freight traffic introduced
in the year 2006-07, has yielded encouraging results.
Therefore, this year we have made a policy for reducing
fares at varying rates, for all services of AC Ist class
and AC II tier class and new design coaches for AC III
tier and AC Chair Car, during peak and non-peak seasons,
in popular and unpopular trains. Similarly commercial
policy for freight transportation has also been made dynamic
and different wharfage rates have been prescribed for
busy and non busy goods terminals.
Passenger
Services
90
Sir, I had announced a reduction of one rupee per passenger
in the fares of second class in August 2005. Despite reduction
in fares, there has been a growth of 14% in passenger
earnings. The boundless affection and patronage of the
people has helped Railways stage a turnaround. In recognition
of this I announce a reduction of one rupee per passenger
in the daily ticket fares of non suburban ordinary passenger
and non superfast mail-express trains. Sir,
Daur-e-
mehngai mein bhi rail sasti rakhi,
par
kamai mein koi kamee na rakhi
91
Last year we had increased the speed of some trains and
upgraded them to super fast trains. On popular demand,
I have decided that the super fast surcharge levied on
second class tickets for super fast trains shall be reduced
by 20 per cent.
92
Sir, we have designed new Sleeper class, AC Chair Car
and AC 3 tier Coaches. From 2007-08, only these high capacity
coaches will be manufactured. We have decided to share
a portion of the benefits of this enhanced capacity with
our customers. In the newly designed sleeper class coach
there will be a general reduction in fare by 4 per cent.
This reduction will be applicable during both lean and
peak seasons. The fares for the newly designed AC-3 tier
and AC chair car coaches would be reduced by 8 per cent
in lean season and 4 per cent in peak season. In popular
trains, this reduction will be uniformly 4 per cent, throughout
the year.
93
Fares for AC I class will be reduced by 6 per cent in
the lean season and 3 per cent in the peak season. The
fare will be reduced uniformly throughout the year by
3 per cent in popular trains.
94
Fares for AC-2 tier class will be reduced by 2 per cent
during the peak season and 4 per cent during the lean
season. The fares will be reduced uniformly throughout
the year by 2 per cent in popular trains.
95
Sir, thousands of people come to Mumbai from outside for
tourism and various other purposes For the benefit of
such people, we have decided to issue tourist tickets
valid for, one, three and five days on the Mumbai Suburban
Service, as a pilot project. Such ticket holders will
be able to travel any number of times, from any station
to any station on the suburban sections of Central and
Western Railways of Mumbai. As a result of this, passengers
will not have to stand in a queue again and again to buy
tickets.
96
The scheme of booking e-ticket through internet from home
has become very popular. To further encourage e-ticket
usage, we have decided to reduce the per e-ticket charge
for Sleeper class and AC classes e-tickets from Rs.25
to Rs.15 and Rs.40 to Rs.20 respectively. Besides this
minimum charge there will be an additional charge of Rs.5
per passenger for booking of every additional passenger
subject to the maximum charges for one ticket being Rs.25
in sleeper class and Rs.40 for AC classes.
Parcel
and Luggage Services
97
Sir, the policy to lease brake vans and parcel vans, through
open tenders, at scheduled or lower rates, has borne good
results. However, there are several trains in which, during
last year, less than 60 per cent of SLR capacity was utilized
and where SLRs could not be leased at scheduled or higher
parcel rates in spite of inviting open tenders. Taking
the rationalization process further, we have decided that
the scheduled parcel rates for all such trains will be
downgraded to the next lower class. If any train is leased
out at scheduled rates in one direction but no lease offer
is received, even after inviting open tenders, in the
return direction, and its utilization is less than 60%
of its capacity, then its class will be downgraded to
the next lower class in that direction. This will bring
about a reduction in parcel booking rates in less popular
trains. A review of parcel and luggage rates will be completed
in the first two months of each financial year i.e. 31st
May.
98
Sir, under the present luggage rates structure, luggage
rates for all trains are 20 per cent higher than the parcel
rates applicable for Rajdhani trains. It is worth mentioning
that the parcel rates for Rajdhani Express trains are
three times the parcel rates for ordinary passenger trains.
Rationalizing these luggage rates, we have decided that
in trains where in spite of calling open tenders at scheduled
rates, offers for leasing of SLRs have not been received
and where utilization of capacity is less than 60 per
cent, the luggage and parcel booking rates will be the
same. As a result of this decision luggage rates in ordinary
passenger and less popular mail and express trains will
be reduced up to 60 per cent.
Freight
Business
99
Sir, to maintain the unprecedented growth in freight transportation,
I announce the following reduction and discount schemes:-
100
Sir, last year I had reduced the classification for diesel
and petrol from class 240 to 220 thereby reducing the
tariff by about 9 per cent. Taking the rationalization
process further, I propose to reduce the highest class
from 220 to 210. This will bring down the freight for
diesel, petrol and ammonia etc, by about 5 per cent.
101
On the demand of mineral based industries like steel,
cement etc., freight rates for transportation of all minerals
including iron ore and limestone will be charged at Class
160 in place of 170. This will reduce the freight rates
for these commodities by about 6 percent.
Empty Flow Direction Freight Discount Scheme
102
Our goods trains run loaded in one direction and mostly
run empty in the return direction. The percentage of empty
running is worse in the case of open wagons. Last year
we had announced a freight discount of 30 per cent during
lean season and 20 per cent during peak season on incremental
loading in the empty flow direction. We have made several
important changes to make this policy more effective.
Since railways face the problem of empty running of wagons
throughout the year, we have decided that in place of
20%, empty flow discount of 30%, will be given during
the peak season also. This discount will apply to both
open and covered wagons in both peak and lean season for
traffic with a lead of more than 700 kms. General Managers
of Zonal Railways will be delegated powers to offer this
discount on traffic with a lead of less than 700 kms also,
unnder certain conditions.
103 Presently, bagged consignments of wheat, fertilizers
and cement loaded in open wagons are given a discount
of 20, 30 and 15 per cent respectively. This discount
is given in both loaded and empty flow directions. We
have now decided that in cases of incremental loading
of bagged consignments in open wagons in empty flow directions
an additional Empty Flow discount at the rate of 30 per
cent will be given but after giving both these discounts,
the minimum charges payable will not be lower than freight
payable at Class LR-3. Thus the disc |